In 2021, we participated in the construction of a tourist catamaran for the Burgas municipality. We were tasked with developing ...
Victron Energy in BulgariaOur main partner is the Netherlandish company Victron Energy, which is famous for its reliable inverters, chargers and other professional equipment. We build ...
Solar energy for Hyundai and JeepIncreasingly, owners of home solar power plants are thinking about buying an electric vehicle (EV), in order to use excess solar energy ...
First time in Bulgaria: Hypontech invertersAfter successful testing of Hypontech inverters we signed an agreement with the manufacturer and became the official partner of the ...
Solar energy for a catamaranWe build solar power plants of various types and for different purposes: grid-tied, off-grid, and hybrid systems, for self-consumption and for ...
Powerful PV system for a home in SofiaAt the beginning of 2021, the owner of a house under construction near Sofia addressed us to install a solar power plant ...
Novelty: Victron Energy RS 450 controllerToday we received equipment from China, Austria and the Netherlands, including the latest solar charge controller Victron Energy RS 450 | ...
Our company received a request for diagnostics of the hot water supply system in the town of Aksakovo. The old solar collector stopped heating the water properly, and the homeowner had to turn on the gas boiler more frequently, which is connected to the boiler through a secondary heat exchanger.
ⓘ This article has been moved to the blog, as we no longer install solar collectors. For many years now, we have been focused on the construction of photovoltaic systems for individuals and businesses.
After the check, we came to the conclusion that the gaseous coolant had partially evaporated from the pipes of the vacuum manifold. We tried to find new pipes, but the Chinese manufacturer no longer exist and the company that installed the entire system 9 years ago, changed its profile.
The old solar collector after dismantling
As we were unable to find spare parts and all other components of the system were working properly, we propose to replace the solar collector. After discussing different options with the client, we installed the new model of VIESSMANN with overheating protection — the flat-panel solar collector Vitosol FM, the absorber of which automaticaly reduces the absorption coefficient of the solar energy depending on the heating of the heat carrier.
We have also pointed out to the client that the protective coating of the copper pipe insulation is in poor condition due to the external environment. As the insulation itself is in good condition, it was decided to replace only the protective tape.
Nothing else needed to be done: the pump and electronics worked fine. We were especially pleased with the 150 liters water heater ELDOM, which has been installed under the roof for 10 years without complaint.
31.08.2021
We build solar power plants of various types and for different purposes: grid-tied, off-grid, and hybrid systems, for self-consumption and for ...
06.11.2022
Increasingly, owners of home solar power plants are thinking about buying an electric vehicle (EV), in order to use excess solar energy ...
Choose a convenient way to contact or fill in this form:
© 2013-2024 NENCOM Construction of photovoltaic systems Bulgaria, Varna, Hristo Smirnenski blvd, 39 |
+359 8 999 68 574 +359 8 999 60 300 +359 877 01 49 01 |
About NENCOM Completed projects Articles and news |
Contact information Company details For partners |